HDPE to PVC Fittings

Product Details
Customization: Available
After-sales Service: 1years
Warranty: 15 Yeas Quality Guarantee
Still deciding? Get samples of US$ 20/Piece
Request Sample
Manufacturer/Factory
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001
  • HDPE to PVC Fittings
  • HDPE to PVC Fittings
  • HDPE to PVC Fittings
  • HDPE to PVC Fittings
  • HDPE to PVC Fittings
  • HDPE to PVC Fittings
Find Similar Products

Basic Info.

Model NO.
DN50~DN800mm
Connection
Welding
Transport Package
PP Bags and Cartons
Specification
50-800
Trademark
SUNPLAST OR OEM
Origin
China
HS Code
3917400000
Production Capacity
5*40hc Container Per Month

Product Description

HDPE Fittings, HDPE butt fusion 90 degree elbow, HDPE elbow, HDPE bends, HDPE pipe bends, poly pipe elbow, HDPE pipe elbow, elbow HDPE 90, HDPE elbow 90, elbow poly pipe,HDPE bend 90,HDPE Spigot Elbow

HDPE 90 degree elbows is used to join two lengths of HDPE pipe on an angle of 90 degrees.

With a size range from 50 mm to 800 mm, SUNPLAST HDPE 90 degree elbows come in SDR 11 & SDR17.  The Fittings in SDR 11 are rated to PN16 for water and PN10 for gas, while SDR 17 fittings are rated to PN10 for water and PN6 for gas.

SUNPLAST HDPE90 degree elbows are injection molded type, fabricated by 100% PE100 material, can fully conform to ISO4427-3,EN12201-3, AS/NZS 4129, EN1555, EN ISO15494 standard.

SUNPLAST keeps mass stock in demand for regular sizes, and customers' urgent demand & prompt shipment request can be satisfied.

More brief details as below:
Product HDPE butt fusion 90 degree elbow, HDPE elbow, HDPE bends, HDPE pipe bends, poly pipe elbow, HDPE pipe elbow, elbow HDPE 90, HDPE elbow 90, elbow poly pipe, HDPE Spigot Elbow
Specification  DN50~DN800mm
SDR/pressure ratings  DN50~DN400mm in both SDR11 & SDR17
DN450~DN800mm in SDR17
Material Virgin PE100 material
Manufacturing Process Injection molded
Color Regular stock in black, blue/yellow available if quantity is big
Manufacturing Standard ISO4427-3,EN12201-3, AS/NZS 4129, EN1555, EN ISO15494
Samples available  Yes, samples are available, but charged.
Packing method  DN50~DN280mm in cartons, DN315~DN800mm be wrapped by PP bags
MOQ  Negotiable 
Customized Logo available
(OEM Service)
For small quantity of order, customer logo can be marked on the fittings by laser marking or sticker.
For big quantity of order, customer logo can be embossed on the fittings.
Production lead time  Mass stock available for regular sizes
About 10 days for a 20ft container, 20 days for a 40ft container
Warranty time  10 years for normal use 
Payment term  T/T, L/C, DP, Western Union, or negotiable 
FOB loading port  Ningbo/Shanghai China 
Place of origin  Ningbo, China 


Product Specifications
HDPE 90 Degree Elbow (Butt Fusion): available from DN50mm ~DN800mm
Pressure: SDR11-PN16 & SDR17-PN10
Material: 100% virgin PE100 material
Color: black color or blue color.

HDPE to PVC Fittings
ΦD L A SDR17 SDR11
50 94 66 ×
63 100 63
75 128 70
90 137 79
110 155 82
125 178 87
140 171 89
160 178 80
180 205 105
200 208 96
225 255 120
250 236 98
280 283 139
315 305 125
355 378 156
400 380 142
450 415 176
500 465 193
560 540 206
630 545 208
710 495 170 ×
800 590 170 ×
(Noted: the technical data is just for reference, some data may change, if you need exact data, then please contact us directly)


Our Product Range
SUNPLAST is a professional manufacturer of HDPE fittings over 20 years in China, and here in SUNPLAST, all customers can find the best solution of fittings for their pipeline systems.

SUNPLAST HDPE butt fusion fittings can be supplied in a diameter ranging from dn50 to dn800mm in both SDR11 & SDR17, with regular types: HDPE end caps, HDPE reducer, HDPE 90 degree elbow, HDPE 45 degree elbow, HDPE 22.5 degree elbow, HDPE equal tee, HDPE reducing tee, HDPE flange adaptor, G.I. backing rings.,etc.

HDPE to PVC Fittings
Applicants of HDPE pipes & fittings
HDPE pipes & fittings are most suitable for agriculture (column pipes for submersible pumps, suction and delivery of water, sprinkler systems, drip/lift irrigation systems etc.), portable water supply, Industrial (Chemicals, corrosive effluents, under water pipes, sewerage handling, radio active waste etc.) and utilities (underground cable ducting) purpose.

HDPE pipes & fittings are a safe, long lasting and cost effective solution for various application like portable water supply, water distribution, irrigation, drainage, sewerage, industrial applicants like coal slurry, coal ash, sand, chemicals, hazardous fluid waste bore-well application and infrastructure projects.

HDPE to PVC Fittings

Butt-fusion procedure For HDPE pipes & Fittings
Butt Fusion is the most important and widely used method of connection for HDPE pipes larger than 110 mm. It is a method of jointing pipe ends by way of heating and cooling under pressure, resulting in pipe joints as strong as the pipe itself.

The principle of butt fusion is to heat the pipe ends to a designated temperature (200-220 C) under pressure for a specified amount of time, then the pipe ends are fused together under pressure for a period of time.

A preparation before welding is necessary. Get ready of the pipes & fittings, and correct butt welding machine as per pipe dimension. Insert two pipes ends on both side of the machine clamps, adjust the alignment of pipe line by tightening or losing bronze nuts on the top aluminum clamps, and clean outside and inside pipe surface.

The major procedure of butt welding including 4 steps:
a). milling process
Insert the facing tool or trimmer between the two pipe ends into the lock position on the welding machine,Start the facing tool or trimmer by turning on the control switch. Slowly approach the pipe ends towards the facing tool or trimmer by controlling the directional valve on hydraulic control unit while keeping control pressure a little higher. The cutter will cut the surface of both pipe ends making them clean, plane and parallel.
b). Effect after milling
Remove the facing tool or trimmer from welding machine to the support frame and clear the facing scraps
from pipe ends. Inspect the ends, they must be clean and plane; otherwise repeat the step 3 - 5 again. During the clearing and inspection, avoid any contact with the surface of pipe ends
c). Heating Process
Check the heating plate temperature on the setting range; cleaning both heating plate side with cleaning agent and insert its back to support while waiting for welding operation to start.
To start with the welding process, begin with the alignment stage by inserting the heating plate between the two pipe ends, moving both pipe ends close together until contact with the heating plate. Start the build up pressure to the alignment pressure level (P1 + drag pressure), maintain the pressure until there are welding seam appear. In this stage, the uniform bead should had been created between the heating plate throughout the whole circumference of both pipe ends. Continue to the heating-up stage by reducing pressure and maintaining the heating-up pressure level (P2) along heating-up time (T2)
d). Cooling Process
Open both pipe ends, carefully remove the heating plate without touching the melted area and see to it that the removing time should not be longer than the changeover time (T3), insert heating plate to the support. Immediately increase pressure up to the joining pressure level (P3 + drag pressure) within the joining pressure built-up time (T4). Uniform beads must be created throughout the whole circumference of the pipe joints. Maintain or Keep the joining pressure constant throughout the cooling time (T5) or until the welding joint cools down. Avoid forced cooling down by applying water.

HDPE to PVC Fittings

FAQS
HDPE to PVC Fittings
* What's the difference between HDPE elbows & HDPE bends?
A: They are referring to the same products.

* How many types of HDPE elbows can SUNPLAST provide?
A: SUNPLAST can provide three types of elbows, which are: HDPE 90 degree elbow, HDPE 45 degree elbow & HDPE 22.5 degree elbow. All HDPE elbow fittings are injection molded type, and be made by virgin PE100 material.

* Can HDPE fittings connect to PVC pipe? Or can HDPE fittings connect to PPR pipe?
A: For thermal plastic fittings, they can be connect to the pipes with same material grade only. So, for HDPE fittings, they can be connected to HDPE pipe only, but can't connect to PVC pipe or PPR pipe.

* How can we connect HDPE pipes to PVC pipes?
A: Since HDPE pipe & PVC pipe are made of different material grade, they are unable to connect together by "heat-fusion".

The possible way to connect them together is by flanged connection. To use HDPE flange adaptor & HDPE backup flanges to make it possible to connect to PVC flanges.

* What's the warranty can SUNPLAST provide?
A: All our HDPE fittings are made of virgin PE100 material, and are designed for 50 years lifetime. SUNPLAST will provide a warranty time in quality of 10 years for regular use.
* What's the packing method for the fittings?
A: For small diameter poly fittings dn50~250mm, our packing method is carton. The big diameter fittings dn280~dn800mm, they will be wrapped by PP bags. Big diameter fittings can also be packed by pallets or wooden cases.

SUNPLAST can do the packing as per customers request.


Contact Us
If you have any requirements on HDPE fittings, or any question on our fittings, please contact us freely. SUNPLAST has well trained staff who are available to address your needs and provide technical support to all sectors when needed.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier