• Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16
  • Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16
  • Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16
  • Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16
  • Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16
  • Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16

Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16

Warranty: 15 Years in Quality Guarantee
Material: HDPE
Connection: Socket
Transport Package: PP Bags and Cartons
Specification: 20-1000
Trademark: SUNPLAST OR OEM
Samples:
US$ 2/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
DN32~DN400mm
Origin
China
HS Code
3917400000
Production Capacity
8000ton/Year

Product Description

 
 HDPE electrofusion reducing tee is used to tee off a HDPE pipe, to add in a smaller size outlet to a PE pipe. Electrofusion reducing tees are often used to supply water or gas to an area from a main pipeline, as they have a smaller off-take (and therefore less flow) than the original pipeline.
 
Electrofusion reducing tee fittings may also be known as an electrofusion tee reducer or EF reducing tee. It has implanted metal coils placed around two ends of outlets, and the other branch outlet are spigot type, and requires a coupler to join it to another pipe or fittings.
 
Made by 100% PE100 material, SUNPLAST HDPE reducing tee electrofusion can can be supplied in a diameter sizing from dn32~dn400mm in SDR11-PN16. SDR 11 electrofusion tee reducer fittings are rated to PN16 for water and PN10 for gas.
 
The electrofusion reducing tee fittings are injection molded in one time, and conform to ISO4427-3,EN12201-3, AS/NZS 4129, EN1555, EN ISO15494 standard (ISO4437-3 for gas)
 
SUNPLAST keeps mass stock in demand for regular sizes, and customers' urgent demand & prompt shipment request can be satisfied.
 
More brief details as below:
Product HDPE Electrofusion Reducing Tee, Electrofusion reducing Tee,Electrofusion tee reducer
Specification  DN32~DN400mm
SDR/pressure ratings  SDR11-PN16
Material Virgin PE100 material
Manufacturing Process Injection molded
Color Regular stock in black, blue/yellow available if quantity is big
Manufacturing Standard ISO4427-3,EN12201-3, AS/NZS 4129, EN1555, EN ISO15494
(ISO4437-3 for gas)
Samples available  Yes, samples are available, but charged.
Packing method  Cartons
MOQ  Negotiable
Customized Logo available
(OEM Service)
For small quantity of order, customer logo can be marked on the fittings by laser marking or sticker.
For big quantity of order, customer logo can be embossed on the fittings.
Production lead time  Mass stock available for regular sizes
About 10 days for a 20ft container, 20 days for a 40ft container
Warranty time  10 years for normal use 
Payment term  T/T, L/C, DP, Western Union, or negotiable 
FOB loading port  Ningbo/Shanghai China 
Place of origin  Ningbo, China 
 
 
Product Specifications  
HDPE Electrofusion Reducing Tee: available from DN32×20~DN400×315mm
Pressure: SDR11-PN16 & SDR17-PN10
Material: 100% virgin PE100 material
Color: black color or blue color.
 
 Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16
 
ΦD×ΦD1 L A B Φd SDR17 SDR11
32×20 118 45 48 4.0/4.7 ×
32×25 118 45 48 4.0/4.7 ×
50×25 147 51 54 4.0/4.7 ×
50×32 147 51 54 4.0/4.7 ×
50×40 147 52 56 4.0/4.7 ×
63×25 168 57 49 4.0/4.7 ×
63×32 168 57 56 4.0/4.7 ×
63×40 168 57 56 4.0/4.7 ×
63×50 168 57 64 4.0/4.7 ×
75×32 186 62 56 4.0/4.7 ×
75×40 186 62 56 4.0/4.7 ×
75×50 186 62 63 4.0/4.7 ×
75×63 186 62 63 4.0/4.7 ×
90×50 210 66 64 4.0/4.7 ×
90×63 210 66 63 4.0/4.7 ×
90×75 210 67 80 4.0/4.7 ×
110×50 215 73 85 4.0/4.7 ×
110×63 215 74 69 4.0/4.7 ×
110×75 215 75 77 4.0/4.7 ×
110×90 238 73 85 4.0/4.7 ×
125×50 239 77 79 4.0/4.7 ×
125×63 239 77 79 4.0/4.7 ×
125×75 239 77 83 4.0/4.7 ×
125×90 239 77 87 4.0/4.7 ×
125×110 256 75 87 4.0/4.7 ×
160×50 248 86 78 4.0/4.7 ×
160×63 248 86 78 4.0/4.7 ×
160×75 248 86 83 4.0/4.7 ×
160×90 250 86 87 4.0/4.7 ×
160×110 305 86 87 4.0/4.7 ×
160×125 307 86 91 4.0/4.7 ×
200×50 297 95 70 4.0/4.7 ×
200×63 297 95 74 4.0/4.7 ×
200×75 297 95 79 4.0/4.7 ×
200×90 297 95 85 4.0/4.7 ×
200×110 365 96 87 4.0/4.7 ×
200×160 366 96 95 4.0/4.7 ×
225×90 400 111 86 4.0/4.7 ×
225×110 400 110 96 4.0/4.7 ×
225×160 400 110 105 4.0/4.7 ×
225×200 400 110 110 4.0/4.7 ×
250×110 431 113 97 4.0/4.7 ×
250×160 432 113 112 4.0/4.7 ×
250×200 433 113 116 4.0/4.7 ×
315×90 511 115 87 4.0/4.7 ×
315×110 511 115 90 4.0/4.7 ×
315×160 511 115 109 4.0/4.7 ×
315×200 511 115 117 4.0/4.7 ×
315×250 511 115 126 4.0/4.7 ×
400×110 620 125 115 4.0/4.7 ×
400×125 620 125 115 4.0/4.7 ×
400×160 620 125 115 4.0/4.7 ×
400×200 620 125 115 4.0/4.7 ×
400×250 620 125 115 4.0/4.7 ×
400×315 620 125 115 4.0/4.7 ×

(Noted: the technical data is just for reference, some data may change, if you need exact data, then please contact us directly)

HDPE Electrofusion Fittings SUNPLAST Can Offer
As a integrated & experienced manufacturer & provider in China, SUNPLAST can supply HDPE electrofusion fittings in a diameter sizing from dn20mm to dn630mm. SUNPLAST HDPE electrofusion fittings include: HDPE electrofusion coupler, HDPE electrofusion reducer, HDPE electrofusion tee, HDPE electrofusion elbow 90 degree, HDPE electrofusion elbow 45 degree, HDPE electrofusion flange, HDPE electrofusion saddles.,etc
 
Here in SUNPLAST, all customers can find the best solution of fittings for their pipeline systems.
Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16
 
Advantages Of HDPE Electrofusion fittings
As a unique memeber of HDPE fittings, electrofusion fittings has all advantages that HDPE fittings have, such as: hygiene, reliability, long-lifetime design, corrosion resistance.,etc.
 
By comparison of the other HDPE fittings, HDPE electrofusion fittings repute more benefits:
* A simpler installation process:electrofusion process is much simpler, and electrofusion machine is much smaller size & lighter weight, this allow the electrofusion fittings can be easily joined to HDPE pipes in circumstances where butt fusion is not practicable.
* lower installation costs & labor costs: electrofusion process is much simpler, and easily operation. This greatly reduce the installation costs & laber costs.
* More reliable joints: The consistency of the electrofusion welding process in creating stronger joints, which is more reliable. Due to more reliable joints, HDPE electrofusion fittings are very popular used in building & repairing gas distribution pipeline.
* Easy for repairing: HDPE electrofusion fittings support secondary welding when some joints leak, and HDPE electrofusion repair saddle can also easily repair the leaking of pipeline.
 
 
Technical Parameter
The HDPE electrofusion fittings are manufactured into ISO4427-3 standard (ISO4437-3 for gas), with technical parameters as below:
Characteristic Requirement Test parameters Test method
Melt mass-flow rate
(MFR)
Change of MFR by
processing ± 20 %
Load=5KGS
Test temperature=190ºC
Test period=10min.
ISO 1133:2005
 
Oxidation induction time  20 min Test temperature=210ºC
Test Piece=3
ISO 11357-6
Hydrostatic strength
at 20 °C
No failure of any test
piece during test
period
Test temperature=20ºC
Test period=100 hours.
Circumferential(hoop) stress=12.4Mpa
ISO 1167
Hydrostatic strength
at 80 °C
No failure of any test
piece during test
period
Test temperature=80ºC
Test period=165 hours.
Circumferential(hoop) stress=5.4Mpa
ISO 1167
Cohesive resistance for electrofusion socket fittings & electrofusion
saddle fittings
Length of initiation
rupture  L2/3 in
brittle failure
Test temperature=23ºC
 
ISO 13954/ISO13955


Raw Material
Raw material with excellent performance is the most import element to manufacture the topping quality fittings. To guarantee the superior quality of our HDPE fittings, SUNPLAST only adopts TOP QUALITY PE100 material from worldwide reputed factories that are approved by PE100+ association. 
The PE100 materials we regular use are: HE3490-LS from Borealis, P6006 from Sabic & YGH041T from Sinopec.
Those PE100 materials are certified as the top raw material by the professional in this vocation. The preferable performance of those materials and their stability establish the high quality station of SUNPLAST HDPE fittings products at all the while.
Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16Manufacturing Facilities
SUNPLAST is a ISO9001 certificated manufacturing factory. As a premier manufacturer of HDPE fittings, the factory has introduced advanced production injection machines and test equipment. All product strictly in compliance with national standards and international standards.

Till now, there is over 10 sets of injection machines in SUNPLAST workshop, available to manufacture HDPE fittings till 800mm, and annual production capacity reaches 5,000 tons.

 


Quality Certificate
SUNPLAST always sticks to the managing guideline of "manufacturing excellence", and commits to provide our customers the HDPE fittings on best quality. All fittings meet the highest quality requirements as stipulated in ISO9001, ISO14000:14001 guidelines and our stringent quality control system.
 
All HDPE fittings have passed the National Chemical Building Materials Test Center tests, and all performance are in line with ISO4427-3/EN12201-3 standard, as well EN1555 standards. At the same time, the fittings are also approved by ISO4427 certificate, CE certificate for EN12201.,etc
Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16


Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16


Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16

Packing & Shipment
SUNPLAST is a premier manufacturer of HDPE pipe fittings in China, and our products have been exporting to more than 40 countries all over the world.
 
SUNPLAST commits to provide the best quality HDPE pipe fittings to all customers in worldwide, and we look forward to becoming your reliable partner for HDPE pipe fittings.
Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16FAQS
Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16
* What's the electrofusion welding process?
A: Electrofusion welding involves the following steps:
• Preparing the pipe for removing the gaps and cleaning the contaminants
• Marking the connection on the pipe, rubbing the pipe surface
• Reinforcing and applying strain on pipe or connector
• Applied electrical current
• Cooling, opening clips
• Documentation of the process
• Final payment, cleaning and removal of contaminants
 
* HDPE butt fusion fittings & HDPE electrofusion fittings, which one is better?
A: HDPE butt fusion fittings & HDPE electrofusion fittings, both are the most common used HDPE pipe fittings.
 
* Material Costs
The HDPE butt fusion fittings are regular much cheaper prices than HDPE electrofusion fittings. The HDPE pipes adopt butt fusion methods, no special coupler fittings needed , so less fittings will be requested, and much lower on material costs.
 
* Installation Costs
The HDPE electrofusion fittings can be welded in much simpler way, which can be used for the certain circumstances where butt fusion is not practicable. Less installation costs & labor costs for electrofusion, as well as electrofusion machine is much lower on prices.
 
*Reliability of Jointing
HDPE electrofusion fittings has a more reliable jointing than HDPE butt fusion fittings. The HDPE electrofusion fittings can weld in secondary times when a leak happens.
 
So, it is difficult to distinguish which one is better, because both of them reputes excellent performances. The HDPE electrofusion fittings can save installation costs and provider a more reliable jointing while HDPE butt fusion fittings are much lower on material costs.
 
Finally, it depends on the project size and type, and location of installation.  Electrofusion fittings can be a better choice for smaller, tighter spaces where onsite welding is being used.
 
* Can HDPE electrofusion coupler be used for welding the PPR pipe?
A: No, HDPE electrofusion coupler is manufactured & designed to weld to the HDPE pipeline only, NOT suitable for PPR pipe.
 
* Is there any barcode on the electrofusion fittings provided by SUNPLAST?
A: Yes, all HDPE electrofusion fittings are with a barcode on it. The worker on site can use electrofusion machine to scan the barcode, so all welding parameter will be inputting to welding machine automatically.
 
* Can electrofusion fittings made by PE100 material weld to the pipe in PE80?
A: Yes, this will be ok. To guarantee the best welding result, we recommend to use PE80 fittings to weld to the PE80 pipe.
 
* What's the typical reasons that make the electrofusion welding fail?
A: The majority of fittings that leak do so because of incorrect installation. The three main causes of joint failure when using electrofusion fittings are:
Poor joint preparation
• Contamination of the joint caused during the jointing process
Misalignment of the pipe within the fitting.
 
So, to achieve the success of electrofusion welding, a well trained installer strictly follow the guide is very important.
 
* Is scraping necessary before Electrofusion?
A: Yes, before electrofusion, the installer shall scrap the oxidation layer on both edage of HDPE pipe, the scrap area shall cover the edage of pipe to the marking line on the pipe, which mark insert depth of the electrofusion fittings. This is necessary step.
 
* What's the effectiveness of electrofusion welding?
A: The effectiveness of electrofusion depends on attention to preparation of the jointing surfaces and ensuring that the surfaces to be welded have satisfactory contact during the welding and cooling cycles. The pipe surfaces to be fused need to be scraped to remove the surface oxidation layer prior to fusion.
 
To prepare the jointing surfaces the pipe surface must be scraped with an appropriate pipe scraper, as recommended by the pipe or fitting manufacturer, to remove the entire surface of the pipe over the area indicated, to a depth of approximately 0.3mm. Following scraping the scraped surface must be wiped with an authorised Ispropanol impregnated pipewipe, as recommended by the pipe or fitting manufacturer, to remove any dust residue. Methylated spirits, acetone, methyl ethyl ketone (MEK) or other solvents are not recommended for wiping the scraped surface. The prepared surfaces must be completely dry before proceeding.
 
The resulting joint, when properly made, is as strong as the original pipe and can withstand all the loads applied during routine installation and operation.
 
 
Why Choose Us?
 Rich experience on manufacturing HDPE fittings over 20 years, we are an expert in this industry.
 Full product range available, you will always find the right solution here.
 Strong after-sale term supports to provide professional guide for installation.
 By using top quality raw material, with long warranty time on quality.
 Short lead time to satisfy your urgent need request.
 Quick reply for your inquiries within 12 hours.
 OEM service available to support a good sale in customers' market.
Poly Pipe T Piece Poly Tee Fittings HDPE Tee DN32~DN400mm in SDR11-Pn16

Contact Us
If you have any requirements on HDPE Electrofusion fittings, or any question on our fittings, please contact us freely. SUNPLAST has well trained staff who are available to address your needs and provide technical support to all sectors when needed.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory
Management System Certification
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001