Customization: | Available |
---|---|
Warranty: | 15 Yeas Quality Guarantee |
Material: | Plastic |
Still deciding? Get samples of US$ 20/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product | HDPE butt fusion flange adaptor, flange adaptor for hdpe pipe,hdpe flange fittings,hdpe flange adapter,hdpe flange,hdpe pipe flange connections ,hdpe pipe flange,hdpe adaptor,hdpe flange adapter with backup ring,hdpe flange connection,poly flange adapter,hdpe flange fittings, HDPE stub flange, HDPE stub ends, HDPE flange ends,HDPE flange spigot |
Specification | DN50~DN1200mm |
SDR/pressure ratings | DN50~DN630mm in SDR11 & SDR17 DN710~DN1200mm in SDR17 |
Material | Virgin PE100 material |
Manufacturing Process | Injection molded |
Color | Regular stock in black, blue/yellow available if quantity is big |
Manufacturing Standard | ISO4427-3,EN12201-3, AS/NZS 4129, EN1555, EN ISO15494 |
Samples available | Yes, samples are available, but charged. |
Packing method | DN50~DN280mm in cartons, DN315~DN1200mm be wrapped by PP bags |
MOQ | Negotiable |
Customized Logo available (OEM Service) |
For small quantity of order, customer logo can be marked on the fittings by laser marking or sticker. For big quantity of order, customer logo can be embossed on the fittings. |
Production lead time | Mass stock available for regular sizes About 10 days for a 20ft container, 20 days for a 40ft container |
Warranty time | 10 years for normal use |
Payment term | T/T, L/C, DP, Western Union, or negotiable |
FOB loading port | Ningbo/Shanghai China |
Place of origin | Ningbo, China |
ΦD | ΦD1 | L | A | B | SDR17 | SDR11 |
50 | 87 | 81 | 70 | 10 | × | √ |
63 | 102 | 81 | 70 | 10 | × | √ |
75 | 121 | 82 | 71 | 10 | × | √ |
90 | 138 | 85 | 72 | 13 | √ | √ |
110 | 153 | 86 | 72 | 14 | √ | √ |
125 | 158 | 105 | 87 | 18 | √ | √ |
140 | 188 | 105 | 85 | 20 | √ | √ |
160 | 207 | 123 | 102 | 21 | √ | √ |
180 | 212 | 140 | 115 | 25 | √ | √ |
200 | 266 | 150 | 123 | 27 | √ | √ |
225 | 265 | 140 | 115 | 25 | √ | √ |
250 | 317 | 151 | 119 | 32 | √ | √ |
280 | 320 | 173 | 137 | 36 | √ | √ |
315 | 370 | 173 | 136 | 37 | √ | √ |
355 | 425 | 186 | 153 | 33 | √ | √ |
400 | 476 | 197 | 160 | 37 | √ | √ |
450 | 526 | 211 | 170 | 41 | √ | √ |
500 | 575 | 222 | 173 | 49 | √ | √ |
560 | 630 | 225 | 174 | 51 | √ | √ |
630 | 690 | 241 | 186 | 55 | √ | √ |
710 | 785 | 220 | 160 | 60 | √ | × |
800 | 875 | 220 | 160 | 60 | √ | × |
900 | 1005 | 225 | 170 | 55 | √ | × |
1000 | 1110 | 220 | 160 | 60 | √ | × |
1200 | 1300 | 300 | 225 | 75 | √ | × |
Characteristic | Requirement | Test parameters | Test method |
Melt mass-flow rate (MFR) |
Change of MFR by processing ± 20 % |
Load=5KGS Test temperature=190ºC Test period=10min. |
ISO 1133:2005 |
Oxidation induction time | ≥ 20 min | Test temperature=210ºC Test Piece=3 |
ISO 11357-6 |
Hydrostatic strength at 20 °C |
No failure of any test piece during test period |
Test temperature=20ºC Test period=100 hours. Circumferential(hoop) stress=12.4Mpa |
ISO 1167 |
Hydrostatic strength at 80 °C |
No failure of any test piece during test period |
Test temperature=80ºC Test period=165 hours. Circumferential(hoop) stress=5.4Mpa |
ISO 1167 |
Tensile strength for butt fusion fittings and spigotted fittings |
Test to failure: Ductile - Pass Brittle - Fail |
Test temperature=23ºC |
ISO 13953 |